Smith Cast Iron Boilers 19A SERIES Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Ohřívače vody a bojlery Smith Cast Iron Boilers 19A SERIES. Smith Cast Iron Boilers 19A SERIES User's Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 12
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
19IOM-5
WESTCAST, INC.
260 NORTH ELM STREET WESTFIELD, MA 01085
TEL. (413) 562-9631 FAX (413) 562-3799
INSTALLER
READ THESE INSTRUCTIONS CAREFULLY. THEY WILL
SAVE TIME IN ASSEMBLING BOILER
19A SERIES BOILER
INSTALLATION
INSTRUCTIONS
STEAM OR WATER HEATING
PRESSURIZED FOR FIRING OIL, GAS
OR COMBINATION GAS/OIL
DESIGNED AND TESTED ACCORDING TO THE A.S.M.E.
BOILER AND PRESSURE VESSEL CODE, SECTION IV
FOR MAXIMUM ALLOWABLE WORKING PRESSURE.
STEAM - 15 PSIG, WATER - 80 PSIG
CANADA: STEAM - 15 PSIG, WATER - 50 PSIG
CAUTION
Do not use automotive anti-freeze in boiler waterways. If necessary to use anti-
freeze, be sure to employ a preparation designed for hydronic heating systems
such as ethylene or propylene glycol.
Water treatment is not recommended. This boiler uses gaskets to seal the ports
of adjoining sections. These gaskets are made of a fluorocarbon elastomer
(designation FKM) marketed under the brand name Viton. Consult a water
treatment professional before adding any chemical to the boiler water. Any
water treatment or anti-freeze added to the system must be compatible with the
Viton gaskets.
THE SECTIONS OF THIS BOILER MUST BE ASSEMBLED
TO THE PROPER TORQUE. READ INSTRUCTIONS
THESE INSTRUCTIONS TO BE LEFT WITH THE BOILER FOR REFERENCE PURPOSES
Zobrazit stránku 0
1 2 3 4 5 6 ... 11 12

Shrnutí obsahu

Strany 1 - 19A SERIES BOILER

19IOM-5WESTCAST, INC.260 NORTH ELM STREET WESTFIELD, MA 01085TEL. (413) 562-9631 FAX (413) 562-3799INSTALLERREAD THESE INSTRUCTIONS CAREFULLY. THEY

Strany 2

19A SERIES BOILERINSTALLATION INSTRUCTIONSFIGURE 11PAGE 10“A” - 1" TAP, PRESSURE CONTROLS“B” - 1 1/4" TAP, STEAM SAFETY VALVE“C” - 1" T

Strany 3 - TABLE OF CONTENTS

19A SERIES BOILERINSTALLATION INSTRUCTIONSvision problemsloss of muscle controlweaknessdizzinessheadachesnauseaWARNINGshortness of breathunclear think

Strany 4

WESTCAST, INC.260 NORTH ELM STREET WESTFIELD, MA 01085TEL. (413) 562-9631 FAX (413) 562-3799

Strany 5

PAGE 219A SERIES BOILERINSTALLATION INSTRUCTIONS— 3640 Burner Mounting Plate,Powerflame - 91/8" Opening13 60023 Burner Mounting Plate Rope, 1/4&q

Strany 6

3. CODES AND REGULATIONSAll work in connection with the boiler, burner and controlsmust be performed in strict accordance with requirements ofstate an

Strany 7

CAUTIONDue to the fact that the sections are top heavy, it isabsolutely necessary that the back section be supportedin such a manner as to prevent its

Strany 8

2. Water Boilers – The assembled boiler shall be subjectedto a hydrostatic test pressure not less than 1-1/2 times themaximum allowable working pressu

Strany 9

TABLE 5Feed water makeup requirements.NOTEThese recommendations are considered normal forcompact buildings on the basis of 80% receiver use.Where buil

Strany 10 - SERIES 19A BOILER (WATER)

FIGURE 6 — TANKLESS PIPINGFIGURE 7 — DUAL TANKLESS PIPING12. BURNER MOUNTING PLATE & TARGET WALLThe new target wall used on 3-6 section boilers mu

Strany 11 - INSTALLATION INSTRUCTIONS

19A SERIES BOILERINSTALLATION INSTRUCTIONSPAGE 815. CONTROL LOCATIONSNOTEJacket front panel should be in place before controls onfront of front sectio

Strany 12 - WESTCAST, INC

19A SERIES BOILERINSTALLATION INSTRUCTIONS19. OWNERS INSTRUCTIONSA. For best performance of the boiler, the followingsuggestions should be performed b

Komentáře k této Příručce

Žádné komentáře